Ready for your Commercial or Industrial Lighting rebate?
Keeping your business bright doesn’t have to be expensive! By utilizing efficient lighting options, you could improve lighting quality, reduce energy consumption, and qualify for helpful Energy Wise rebates all at the same time.
Follow these simple steps
Apply For Your Commercial or Industrial Lighting Rebate
This application is for projects completed between Jan. 1, 2024 and Dec. 31, 2024. Pre-approval is not required for this prescriptive program. Incentives are available on a first-come, first-served basis.
Determine Eligibility
Equipment must be new (used equipment is not allowed) and installed in a commercial, industrial, or farm facility that is a Great Lakes Energy electric member, as well as meet minimum requirements set forth in this application. Projects must result in reduced electric energy usage due to improvement in the system efficiency; control upgrades may also qualify. Equipment must operate a minimum of 1,800 hours per year unless otherwise specified. Applications with fewer hours may use the custom program. Incentives for prescriptive measures may not exceed 75 percent of the total project cost, unless otherwise specified.
Install Equipment
After ensuring your project will qualify, purchase, and install the equipment. New equipment must be installed, and old equipment removed. Only new products that are exact product types listed in this form are eligible for prescriptive incentives.
Submit Application
Application must be submitted with complete information within six months of project completion. Application must include:
- The entire completed application, including the completed incentive worksheets and the signed member information page.
- Itemized invoices from the installing contractor(s) and/or vendor(s) for the project. Invoices must include a separate line item for each incentive measure, as well as the date, quantity, unit cost, size, type, make, and model of installed items, and labor costs, if applicable.
- Specification/data sheets for all equipment for which an incentive is requested.
Payment
Once completed paperwork is submitted, your final application will be reviewed and processed for payment. Incentive payments are usually mailed within six to eight weeks.