Ready for your Custom Project rebate?

Follow these simple steps

Apply For Your Custom Project Rebate

This application is for projects completed between Jan. 1, 2025 and Dec. 31, 2025. Pre-approval is not required for this prescriptive program. Incentives are available on a first-come, first-served basis.

Determine Eligibility

The specifications for eligible equipment are listed within each section on this form.

If the equipment you are installing is specified differently than how it is listed on this form, please call to verify eligibility. Custom incentives are available for many technologies not listed. Replacements are one-for-one unless specified. Replaced equipment must be removed from service.
If applicable, all lighting projects must comply with all applicable electrical, safety, and energy codes. Electrical permits are required for most lighting projects including lamp replacements in some cases. Contact your local authority having jurisdiction for more information.

  • Post-installation light levels are expected to meet current IESNA (Illuminating Engineering Society of North America) recommendations.
  • Fixtures must be UL or CSA listed and either ENERGY STAR® or DesignLights Consortium® (DLC) qualified as noted.

Incentive will not exceed 75 percent of the project cost as defined in the Terms & Conditions.

Install Equipment

After ensuring your project will qualify, purchase, and install the equipment. New equipment must be installed, and old equipment removed. Only new products that are exact product types listed in this form are eligible for prescriptive incentives.

Application must be submitted with complete information within six months of project completion. Application must include:

  • The entire completed application, including the completed incentive worksheets and the signed member information page.
  • Itemized, paid invoices from the installing contractor(s) and/or vendor(s) for the project. Invoices must include a separate line item for each incentive measure, as well as the date, quantity, unit cost, size, type, make, and model of installed items, and labor costs, if applicable.
  • Specification/data sheets for all equipment for which an incentive is requested.
  • For the full program Terms and Conditions, please refer to this page.

Submit Application

Payment

Once completed paperwork is submitted, your final application will be reviewed and processed for payment. Incentive payments are usually mailed within six to eight weeks.

Grant Application

[vfb id=15]